Skip to content
Home » Finished projects

Finished projects

Repairs and reinforcement of steel structures

PGE Narodowy Bypass

Due to its experience and resources, Saskers was selected to carry out the challenging task of installing a rope bypass in the structure of the PGE Narodowy stadium. After a defect was detected in one of the steel rope connectors—elements supporting the spire of PGE Narodowy—the facility was closed to visitors. A special load-relieving bypass for the structure, brought from Italy, weighed 6 tons and was installed by the Saskers team 45 meters above the stadium floor. It enabled the repair of the damaged part of the roof.

Material from TVN Warszawa available in the link: (The National Stadium is reopening. Not all spaces will be available to guests)
Stadion Narodowy wznawia działalność. Nie wszystkie przestrzenie będą dostępne dla gości > > >

STEEL ROPE INSPECTIONS AND EXPERT ASSESSMENTS

MAGNETIC TESTING OF STEEL ROPES – MRT

Work at heights

INSTALLATION OF PROTECTIVE NETS

GENERAL CONSTRUCTION CONTRACTING

Construction works

Renovations

Machine plastering

en_GB